Hi K***h,
Great questions,here’s some more color:
1. Program Scope & Customer Mix
• Our current portfolio is roughly split between DoD-led strategic payloads (about half), NASA science and technology missions (around one-third) and a handful of commercial small-sat and rideshare efforts.
• Projects span early-stage concept studies and mission definition in Phase A all the way through production, test and delivery in Phase D.
2. IPT Size & Composition
• Core team is typically 8,12 direct contributors:
, 2,3 Systems Engineers (requirements, architecture, interfaces)
, 2 Manufacturing Leads (process development, floor-planning)
, 1,2 Quality Engineers (root-cause analysis, MRBs)
, 1,2 Supply-Chain Specialists (sourcing, supplier performance)
, 1,2 Test & Integration Managers
• You’ll also draw in extended support (avionics, propulsion, software SMEs) plus partner closely with Contracts, Business Development and Export Compliance.
3. Lean Scaling Challenges & Mitigations
• Early-phase Kaizen events and value-stream mapping work well, but as you transition into Phases C/D we often hit barriers around cross-supplier alignment and data visibility.
• To overcome this, S***s embeds lean coaches from Phase A, establishes a cross-phase CI steering committee and aligns metrics (lead time, first-pass yield) across design, manufacturing and test.
• Regular “deep-dive” workshops with suppliers and IPT members keep momentum going and surface process gaps before they cascade.
I’d be happy to dive deeper on any of these points or connect you with one of our current Program Managers for a firsthand perspective. When would be a good time for a quick 30-minute chat?
Best,
J***e
HR Recruiter, StrategyBrain